Six measures to ensure the quality of decoration

2022-07-22
  • Detail

Decoration quality is one of the most concerned issues in decoration, because the quality of decoration is the most direct impact on the quality of home life. So how to control the decoration quality? Today, let's teach you six methods. Let's take a look together. Good quality can guarantee the quality of home furnishing

1. Grasp the quality of home decoration design scheme

iso9000 has “ Quality is designed. Without design, there is no material preparation and construction; If the design is incomplete and the depth is not enough, it is difficult to guarantee the material quality and construction quality. In the current home decoration design process, the owner mainly judges the designer's level through communication with the designer to determine the design scheme, which has many problems. In fact, we can consider walking and looking more, comparing the design ideas and styles of different designers, knowing well and choosing the most suitable designer, which is the premise to ensure the quality of the design scheme

at the same time, before the design scheme comes out, we must consider how the family lives, that is, what each family member should do every day, and actively communicate with the designer to tell your likes and dislikes in detail; In reality, some owners like to change the scheme during the construction process. After a good look, they feel inappropriate and change and start over. This will lead to the delay of construction period, the waste of labor and materials, and the increase of costs. Of course, it is unrealistic not to change at all, so try to do your best before construction

2. Select a high-quality construction team

the quality of construction is closely related to the technology and quality of the construction team; No matter how good the design is, if it cannot be refined, the quality and effect will be greatly reduced. The quality of the construction team is mainly reflected in the delicacy of detail treatment. A good construction team will carefully handle every link and perfectly show the design idea in front of your eyes. This requires the owners to pay special attention to the selection of construction teams

the selection of construction teams cannot compare prices, but should be compared in many ways:

(1) the quality of personnel invested by the construction unit is the key to the quality of decoration projects, so it is necessary to require that the types of work should be complete, and the main work must be checked by skilled technical workers

(2) check whether the input of personnel and machinery of the construction unit can meet the construction progress and quality requirements. The equipment should be complete and its performance should be maintained in good condition

(3) understand the company's internal management, the procurement quality and channels of relevant raw materials, how to consume materials, construction quality and time. Regular companies have professional quality supervision and inspection personnel, fixed purchase channels, construction material instructions, and customer supervision are well documented; Regular decoration companies have warranty period and warranty agreement. In case of any decoration liability accident, the company has the ability to compensate

when decorating a house for ordinary families, it is best to choose a brand company with strong strength, strict engineering control, professional designers and good literacy, which can not only ensure quality, but also save some costs. Looking for a too small construction team may cost less, but due to poor management, the construction quality may not be guaranteed

3. Pay attention to the details when signing the contract

for honest home decoration companies, the contract is equivalent to a piece of waste paper. However, for home decoration companies that do not speak in good faith, strict contract agreements are important evidence for future prosecution. So what kind of contract? What content and attachments should be included? How to settle the expenses? What is the construction period? Are the rights and obligations clear and detailed? These should be stated in the contract to avoid wrangling. The general construction contract is divided into two parts: original and duplicate. The effect drawing, plan, elevation drawing, section drawing and other drawing attachments are detailed. In addition, an accurate and fine budget is also required. The contract can be signed after both parties confirm the contents of the contract

at the same time, since most of the decoration companies' supervisors are subordinate to the company, in order to prevent the acceptance from not being in place, it is recommended to use companies with a supervision mechanism of more than 8 levels, and if necessary, it is even necessary to ask the decoration company to invite a third-party supervisor to supervise and guarantee

4. Strictly control the quality of materials

in the decoration project, materials account for 80% or more of the whole cost. Therefore, the quality of materials directly affects the quality of decoration. Do a good job in the acceptance of materials, and check whether the quantity, grade and specification of mobilized materials are consistent with those agreed in advance on the bill of materials. If problems are found, they can be improved in time. In particular, the acceptance of materials should be more careful to prevent the mobilization of fake and inferior materials. Generally, the following points should be well controlled:

(1) control before ordering

(2) control after purchase; (3) Control of materials prepared on site

(4) control of materials used on site

of course, materials are always used. It is best to use proprietary materials provided by the company, so as to avoid cutting corners and shoddy products

5. Pay attention to structural safety

many owners often require the decorator to change the room structure in order to achieve the space and lighting they need, but such changes must be cautious. For the safety of yourself and others, we must protect the building structure and operate in strict accordance with the architectural drawings. Generally, the following points should be paid attention to:

(1) do not arbitrarily transform the structure, which is very easy to cause floor cracking

(2) do not use overweight materials, raise the floor, lay marble in a large area, build internal walls with bricks and make ceilings with complex structures. Sometimes, a large number of overweight materials are required, which may make the load of the house exceed the design standard, resulting in the inclination and subsidence of the building

(3) do not change the purpose of the house without authorization. It is extremely dangerous to change the kitchen into a bedroom and the outer balcony into a kitchen or bedroom

(4) in other aspects, for example, it is required to pay attention to circuit design, waterproof and fireproof treatment in the process of home decoration. Do not connect the gas pipeline and gas meter by yourself. Do not choose or use materials by mistake and change the original design for fire prevention, etc

6. Strictly control the construction quality

home decoration quality control is a process control. Now many owners have misunderstandings, thinking that the house is fully decorated, and finally have a general acceptance. In fact, this idea is wrong. Now some small home decoration companies or guerrillas give you an acceptance after the installation and repair. If there is a real problem, it is undoubtedly rework and delay the construction period, and a lot of money is wasted

reliable home decoration acceptance should implement step-by-step acceptance: it is divided into early acceptance, medium-term acceptance and completion acceptance, among which medium-term acceptance is the most important; The mid-term acceptance of the construction shall be carried out after the carpentry foundation is completed. At this time, the ceiling and gypsum line in the room are also completed, the wall tiles in the kitchen and bathroom have also been pasted, and the walls that need to be painted should be puttying twice. Industry experts pointed out that when the decorative panels of all fine wood products are pasted and the wood thread is glued, consumers can carry out the acceptance of the next stage. The inspection at this stage should focus on the color difference and texture of wood products, as well as the flatness and evenness of large areas and gaps. After the woodwork is completed, the oiler can start the primer treatment, and all floor tiles should be pasted within this stage

the final is the completion acceptance after completion. Check the installation of sanitary ware and hardware, the finish paint of wood products, the coating of wall and top surfaces, the position of panels and lamps installed by electricians, line connections, etc

in addition, concealed works are an extremely important part of step-by-step acceptance (concealed works acceptance refers to the inspection and acceptance of covered parts such as ground waterproof, water circuit transformation, ceiling keel skeleton, wall base treatment, door pocket and furniture skeleton). The owner can ask the decoration company to conduct the pressure test, and the owner had better participate in it personally to see whether there is water leakage and ponding. The circuit acceptance is also very important. The owner invites the professional electrician of the decoration company to check the circuit. During the acceptance, all electrical appliances can be opened to let the circuit operate at full load to see whether it is normal. If the construction quality of the concealed works is not up to standard, there will be major hidden dangers, and it will be quite troublesome to repair in the future. Therefore, after the concealed works are completed, strict acceptance must be carried out, and they can be sealed only after confirmation